• Mews House

    Tucked away in the quiet back streets of Marylebone,  this Victorian mews is undergoing a full refurbishment with the addition of a new roof extension. To maximise the available space for storage, a new pivoting staircase element has been designed with counterweights concealing bicycle storage within.

    photofront-bw
    sketch1
  • Artist Studios table

    We have been commissioned to make a table out of ancient petrified wood for the Artist Studios in Chelsea, our project which is currently on site and due for completion early next year. We traveled to Croatia to carefully select this precious material and to ensure that every step of the process is well-considered.

     

    L1120498
    L1120500
    titestreet_481

     

  • Contemporary new build in Mayfair

    We are thrilled to have been appointed to design a new mixed-use contemporary art gallery and residential building in the heart of Mayfair, London.

    stanford19aa

  • Neolithic at the Royal Salute Coronation Cup

    Neolithic once again graced the stage this time at The Coronation Cup polo at Windsor Park the oldest team sport in history.  The bar made from 8000 year old oak was a focal feature at this prestigious event sponsored by our collaborators at Royal Salute with HRH Prince Charles in attendance.

    Coronation Cup

  • Sally gives a talk at Multiplex by Tom Dixon

    Invited by Tom Dixon, Sally gave a talk about designing and making Neolithic, a 21st Century Bar made from 8000 year old oak at ‘Tomorrow’s World’ event at Multiplex.

    photo- SM talk

  • WIN Awards 2015 winner

    We are thrilled to announce that The Mellier building on Albemarle Street, Mayfair is awarded the Residential Development Interior of the year.

    WINWinner_Large
    _JRH9674_JG_VJH3F_L
  • Elle Decoration Directory

    Great to get a double page spread in The October issue of Elle Decoration directory of architects and interior designers.

    IMG_2403
  • New Studio, King’s Cross

    The first stage of the King’s Cross development is now almost complete and we have moved into our brand new offices.

    Our new address is: 7b St Pancras Way, London, NW1 0PB.

    South Stables Image

  • House & Studio, King’s Cross

    Work on site is now progressing, the roof is being replaced and the internal fit out is well underway.

     

     

     

     

     

     

     

     

     

    IMG_2245 IMG_9883

  • Artist Studios, Chelsea

    Strip out and demolitions have commenced and excavations are underway at the Artist Studios on Tite Street. We are on schedule to complete early next year.

    IMG_1566 IMAG0920

  • Stripping out at King’s Cross

    Work has now started on site at the house and studio development at King’s Cross. It’s great to see it finally being stripped out and taken back to the original black and white painted brick walls which has revealed cast iron brackets where the stall dividers would have been when it was formerly used as stables for the Midland Railways. Pieces of old leather tack and horse bits have also been found blocking the drains in the main courtyard.

    This project is being run in two phases, the front building is due to complete this Summer and the rear building in February 2015.

     

    Image1 Image2